Planning and production control in the medium term for textile industry model in a make to order environment

Gerson Arredondo Ortega | Bio
Universidad del Valle
Kelly Vanessa Ocampo Jaramillo | Bio
Universidad del Valle
Juan Pablo Orejuela Cabrera | Bio
Universidad del Valle
Carlos Alberto Rojas Trejos | Bio
Universidad del Valle

Abstract

In this paper a methodology for planning and control of production in the medium term is proposed for the textile industry sector in a make to order environment. The methodology is based on two phases arising from the characteristics of the production system. In the first phase, an aggregate planning model, which allows the calculation of quantities produced in the own workshop and the amount to outsource of clothes to work on so that it meets the economic objectives and obtain the greatest benefit for the industry in the planning horizon. In the second stage, an operations programming model is proposed, which aims at producing sequences for the quantities that need to be produced in the workshop so that the make span is reduced. The two proposed phases constitute an important tool to support decision-making on production management in the textile sector.

References

[1] D. Sipper and R.L Bulfin, “Planeación y Control de la Producción”. México: McGraw-Hill, 1998. 175.

[2] J.A Domínguez Machuca, “Dirección de Operaciones, Aspectos Tácticos y Operativos en la Producción y los Servicios”. España: McGraw-Hill, 1995. 37.

[3] M.L Pinedo, “Scheduling. Theory, Algorithms, and Systems”. Estados Unidos. Prentice Hall, 2012. 676.

[4] P Egri, A Kovács, A Marcus and J Vánza, “Project-Oriented approach to production planning and scheduling in Make to Order Manufacturing”, Production Systems and Information Engineering, vol. 2, no. 1, Diciembre 2004, pp. 22-36.

[5] M Gutiérrez Fernández, “Rediseño de Procesos del Sistema de Planificación y Control de la Producción en la Industria de Ingeniería –Bajo- Pedido Basado en las Tecnologías de la Información”. Tesis Doctoral. Universidad Politécnica de Madrid, 2009.

[6] J.P Orejuela Cabrera, J.J Ocampo Carrillo and C.A Micán Rincón, “Propuesta metodológica para la programación de la producción en las PYMES del sector artes gráficas, área Publi-Comercial”, Estudios Gerenciales, vol. 26, no. 2, Enero 2010, pp. 97-118.

[7] LGiraldo Páez and M Salcedo Galíndez “Propuesta metodológica para la estimación de la capacidad de la producción en un restaurante de fabricación masiva”. Tesis Ingeniería Industrial. Universidad del Valle, 2010.

[8] N. Núñez Orozco and W.F Arroyave “Planeación y Control de la producción en ambientes de fabricación MaketoOrder”. Tesis Ingeniería Industrial. Universidad del Valle, 2011.

[9] S Ruiz, O.D Castrillón and W.A Sarache, “A Multiobjective Methodology to Optimize a Job Shop Environment”, Información Tecnológica, vol. 23, no. 1, Abril 2011, pp. 35-46.

[10] P Escobar, J.A Giraldo and D.M Cárdenas, “Scheduling Hybrid Production Systems, Make to Stock/ Make to Order, using Group Analytic Hierarchy Process Ordering (GAHPO)”, Información Tecnológica, vol. 23, no. 5, Mayo 2012, pp. 33-46.

[11] J.P Orejuela Cabrera “Desarrollo de un modelo jerárquico de planeación de la producción en un flowshop: Caso Industria de Concentrados”. Tesis Ingeniería Industrial. Universidad del Valle, 2008.

[12] H.H. Toro Díaz y L. Delgado Hidalgo, “Optimizing a two-echelon capacity-constrained material requirement manufacturing system using a linear programming model”, Ingeniería e Investigación, vol. 30, no. 1, Abril 2010, pp. 168-173.
How to Cite
Arredondo Ortega, G., Ocampo Jaramillo, K. V., Orejuela Cabrera, J. P., & Rojas Trejos, C. A. (2017). Planning and production control in the medium term for textile industry model in a make to order environment. Revista Ingenierías Universidad De Medellín, 16(30), 169-193. https://doi.org/10.22395/rium.v16n30a9

Downloads

Download data is not yet available.

Send mail to Author


Send Cancel

We are indexed in